Construction Photos
(last updated 06/21/07)
|
|
 |
Site before construction.
(Nov. 11, 2006)
|
| |
|
Charging the site with fill.
(Jan. 16, 2007)
|
 |
| |
|
|
Charging complete; elevation +6 feet above grade.
(Feb. 12, 2007)
|
| |
|
Footings and foundation
wall at library.
(Feb. 20, 2007)
|
 |
| |
|
|
Concrete slab in gymnasium.
(Mar. 27, 2007)
|
| |
|
Steel on site.
(Apr. 24, 2007)
|
 |
| |
|
|
Phoenix rising.
(May 9, 2007)
|
| |
|
Routing the parallel strand lumber (PSL) beams.
(May 14, 2007)
|
 |
| |
|
|
Public bar; Chesapeake Bay beyond.
(May 23, 2007)
|
| |
|
Roof structure at public bar.
(May 23, 2007)
|
 |
| |
|
 |
Block walls being erected in classroom wings.
(May 23, 2007)
|
| |
|
Horizontal raked joints articulate
8" concrete masonry units.
(May 23, 2007)
|
 |
| |
|
 . |
Scupper channels rainwater into constructed wetlands.
(May 23, 2007)
|
| |
|
View from Bennett Creek.
(May 23, 2007)
|
 |
| |
|
|
Students tour future school with architect and builder.
(May 30, 2007)
|
| |
|
Steel in place for walkways around break-out areas.
(June 12, 2007)
|
 |
| |
|
 |
Steel for "life boat" instructional areas.
(June 12, 2007)
|
| |
|
Steel frame for south-facing classroom windows.
(June 21, 2007)
|
 |
| |
|
 |
Frames for exterior light shelves that will shade south-facing windows.
(June 21, 2007)
|
|
|