Facts and Figures
BASIC FACTS
Name: John Paul Jones Arena
Location: Charlottesville, Va.
Ground breaking: May 30, 2003
Open date: July
2006
Project Cost: $129.8 million
Capacity: 15,
219 (basketball)
Major Tenant: University of Virginia Cavaliers
men’s and
women’s
basketball
DESIGN FACTS
Site: 26.2 acres at the corner of Emmet Street and Massie Road
Building dimensions: 471’-0” x 341’-0”
Area: 365,916 square feet
Volume: 11,952,593 cubic feet
Height: 111’-5” above grade
Clear span: 297’-0”
Scoreboard: center-hung, four-screen, high-definition Diamond
Vision
LED ribbon
board: 670 linear feet total, 601,000
pixels
Chillers: 2 x 1,200 tons
Boilers: 4 x 10,200 Mbtu
Power: TBD
CONSTRUCTION FACTS
Topping date: June 22, 2005
Columns: 26 pre-cast concrete (up to 23’-10 5/8” high
and 21,183 lbs)
Bricks: 600,000 wood-moulded, Old Virginia bricks
Cast-in-place
concrete: 28,000 cubic yards
Reinforcing
steel: 2,100 tons
Structural
steel: 8,900 members
Roof trusses: 41 (the largest weighs 190 tons)
Bolts/truss: 1,600
Roof decking: 2,131 squares (100 SF/each)
SEATING FACTS
Tread depth: 34” in lower bowl, 33” in upper bowl
Basketball
capacity: 15,219
Center-stage
event capacity: 15,766
End-stage
event capacity: 14,450
FUN FACTS
Box office
windows: 15
Concession
points: 56
ATM points: 2
Flat-screen
televisions: 150
Loudspeakers: 69
Amplification: 125,00 watts
Bathrooms: 45
Toilets: 369
First-aid
stations: 3
Level: 3 (event level, lower concourse, and upper concourse)
Passenger
elevators: 3
Press stations: 73
TV camera
locations: 10
Suites: 19 total (including 1 double-suite)
Courtside
seats: 11 |